We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Bon Air, AL foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Bon Air, AL job.
Most crack injection appointments can be scheduled within a day or two of your call.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

Every Bon Air, AL Foundation Crack Repair job starts with an inspection, not a generic package — here's what that typically includes.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
We also check for bowing alongside stair-step cracks, since that combination can point to a bigger structural issue.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
We also check the exterior grading near the crack, since poor drainage is often what caused it in the first place.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
We check the injection ports after curing to confirm the material fully filled the crack before we consider the job done.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Bon Air Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Bon Air Homeowner
"Appreciated the before-and-after photos for our records in case we ever need them for a future sale."
— Bon Air Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Bon Air Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Yes — we provide before-and-after photos and a repair summary that Bon Air, AL buyers, sellers, and lenders commonly request.
Selling a Bon Air property on a tight timeline? Call +1-866-476-1348 and we'll prioritize scheduling around your closing date.



Zip codes we serve in Bon Air, AL: 35032
One call gets you a licensed specialist, a written quote, and a same-day time window.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.